Title: Rv7 leading edge rib rivets Post by Richard_Coates on 19.01.2016 at 22:20:13 Has anyone got another way to rivet the leading edge ribs.Vans say to use A470-4 with the manufactured heads on the rib flange........I can't see how I can hold the rivet gun inside the leading edge to do this :-/ Vans sent an email to say that LP4s are ok......anyone else done that? |
Title: Re: Rv7 leading edge rib rivets Post by Tristan Murphy on 27.01.2016 at 17:36:10 Hi Richard I had the very same problem with mine but DO NOT use the LP-4 rivets without checking with your inspector. I asked mine and he asked the LAA for guidance - the answer was a definite NO! I believe the thinking is that only the driven rivets have the requisite strength. The answer for me was for my Dad to hold the gun while I manoeuvred the bucking bar. It was far from pretty but was effective. Good luck. Tristan |
Title: Re: Rv7 leading edge rib rivets Post by Richard_Coates on 28.01.2016 at 11:30:45 Thanks Tristan I got another email from Vans saying that the rivet head can go either way......all done,shop heads on the rib flanges thanks to my neighbour's help on the gun :) |
UK Vans RV Builder & Pilot Forum » Powered by YaBB 2.1! YaBB © 2000-2005. All Rights Reserved. |